2.5MW/5MWh Grid-side in Finland

Project Overview

BESS for FCR in Finland deploys a 2.5MW/5MWh grid-side battery energy storage system with intelligent EMS to deliver peak shaving and fast frequency response for Fingrid reserve services (FCR and FFR).

In response to Finland’s accelerating renewable integration and rising need for fast frequency support, FFD POWER deployed a 2.5MW/5MWh grid-side BESS to deliver peak shaving and frequency regulation services. This project demonstrates how a grid-side BESS can meet Fingrid’s fast-response frequency requirements while also performing peak shaving—unlocking multi-service revenue and improving system stability without relying on fossil-fuel peakers.

Finland 2.5MW/5MWh grid-side BESS for peak shaving and Fingrid FCR frequency regulation
Intelligent EMS-controlled BESS providing power dispatch, frequency response, and load balancing for Fingrid FCR-N/FCR-D and FFR

Project Background

Finland’s power system is progressing rapidly toward a higher share of variable renewable generation, which increases the need for fast, accurate balancing resources. Grid-side BESS provides high-speed active power response and can participate in Fingrid’s reserve market, including FCR-D and FCR-N, while also capturing value from time-of-use energy arbitrage.

Project Challenge

FFD POWER Solution

FFD POWER delivered a grid-side BESS solution with an EMS capatible of multi-market co-optimization. The control system continuously evaluates reserve signals, price forecasts, state-of-charge (SoC) limits, and operating constraints to schedule charging and discharging, enabling simultaneous frequency support and peak shaving while maximizing overall project economics.

System Specifications

Operational Logic: Multi-Market Co-Optimization

The EMS coordinates reserve services and energy shifting through a closed-loop optimization strategy: