Company news
EUROPEAN BESS MANUFACTURE

FFD POWER Launch C&I BESS Manufacturing in Cremona, Italy in May 2026

Joint venture Huzhou FFD  Power Technology Co., Ltd. to localize BMS, EMS and FFD POWER-branded C&I BESS cabinet production in Europe; initial cabinet platforms: 261 kWh / 125 kW and 418 kWh / 210 kW

We ( Guangdong FFD POWER TEC CO., LTD ) announce that our Italy-based manufacturing project in Cremona will officially launch in May 2026, producing FFD POWER-branded commercial & industrial (C&I) battery energy storage systems (BESS) for the European market.

The project will be executed through Huzhou FFD Power TEC Co., Ltd., established to expand overseas C&I energy storage business and to support R&D, production, and sales for international markets. Public reporting on the joint venture structure states that the entity will focus on overseas C&I energy storage systems and forms part of an “technology + product + operations” internationalization strategy.

EUROPEAN BESS MANUFACTURE: technicians inspecting C&I BESS cabinets

A “localize-the-core” manufacturing plan: European PCBs, software, and near-complete cabinet localization

The Cremona hub is planned as a European manufacturing and integration base built around “localize-the-core” execution—bringing critical electronics, control software, and cabinet production closer to European customers and project sites.

FFD POWER’s published product and technology materials highlight an EMS architecture that combines remote monitoring, cloud services, and on-site control (e.g., app, server, HMI, and controller layers) to enable real-time operational response and remote troubleshooting—capabilities that align with the company’s standardized cabinet-based deployment strategy.

 

BMS localization (European PCB manufacturing + firmware updates)

BMS control boards (PCBs) will be manufactured locally in Europe, with localized testing, version management, and update capability for firmware and protection logic. The program leverages Hangzhou Huasu’s position as a leading BMS specialist to strengthen battery safety management, monitoring, fault protection, diagnostics, and lifecycle optimization.

EMS localization (European PCB manufacturing + program/logic updates)

EMS controller and communication boards (PCBs) will be produced locally in Europe, enabling faster iteration for site requirements and faster deployment of program updates. FFD POWER’s EMS platform is designed to support BESS dispatch strategies, operating modes, monitoring, and control integration, and the company reports that its EMS has been deployed across more than 3,000 BESS projects, providing a mature operational foundation for European-scale rollout.

Cabinet manufacturing & system integration (localized in Europe, excluding battery cells)

The C&I BESS cabinet will be manufactured locally in Europe, with localization covering mechanical structure, electrical assembly, wiring, auxiliaries, and system integration—with the battery cells as the primary exception. The Cremona site will also implement standardized production processes, factory testing, and delivery readiness workflows to support repeatable deployment.

Initial FFD POWER-branded C&I BESS platforms planned for Cremona production

The Cremona manufacturing roadmap will focus initially on two standardized, turnkey cabinet platforms under the FFD POWER brand:

261 kWh / 125 kW all-in-one C&I cabinet

Optimized for fast deployment and standardized low-voltage integration, Galaxy 233/261L-AIO-2H is presented as a high-integration turnkey cabinet combining battery storage, PCS, BMS, intelligent EMS control, thermal management, fire safety, and SCADA connectivity. Key published parameters include: Rated options: 100 kW / 233 kWh and 125 kW / 261 kWh Battery configuration: 5 liquid-cooled battery packs LV interface: direct 400 V output (220/400 V output voltage), 50/60 Hz Operating modes: VSG / PQ / VF modes for flexible control (grid-forming / grid-following and active/reactive regulation positioning) Communications: Modbus TCP/IP and IEC 61850 For rollout efficiency, the product page states that a single 40-foot HQ container can hold up to 10 units, supporting cost-effective deployment at scale.

418 kWh / 210 kW high-capacity C&I cabinet

418 kWh / 210 kW high-capacity C&I cabinet — Galaxy 418L-AIO-2H Designed for larger C&I sites and scalable multi-cabinet systems, Galaxy 418L-AIO-2H is described as a turnkey, cabinetized all-in-one BESS integrating battery storage, PCS, BMS, intelligent EMS control, high-voltage box, thermal management, fire safety, and SCADA connectivity. Key published parameters include: Rated power/energy: 210 kW / 418 kWh Battery configuration: 4 liquid-cooled battery packs AC output options: 690 Vac or 800 Vac (optional), 50/60 Hz Control protocols: Modbus TCP/IP and IEC 61850 The product page also highlights a “pioneering 800 Vac option” aimed at smoother integration with 800 V PV systems and reduced infrastructure complexity in certain designs.


Cremona is where we turn European localization into reality—European PCBs and updates for BMS and EMS, and European cabinet manufacturing and integration, excluding cells—starting May 2026

Ang Li , CEO in FFD POWER

Why “EUROPEAN BESS MANUFACTURE” matters: delivery speed, engineering adaptability, lifecycle service

With the May 2026 official launch, FFD POWER expects the Cremona site to strengthen European project execution by:

  • Shortening lead times and reducing cross-border logistics exposure

  • Improving commissioning efficiency through standardized cabinet platforms

  • Enhancing service responsiveness via localized manufacturing-linked support readiness

  • Scaling deployments consistently using repeatable cabinet architectures and integrated EMS control

FAQs

Explore frequently asked questions about our services.

FFD POWER EUROPEAN BESS MANUFACTURER will be located in Cremona Italy 

FFD POWER EUROPEAN BESS MANUFACTURER will be started in May 2026

261 kWh / 125 kW all-in-one C&I cabinet  AND 418 kWh / 210 kW high-capacity C&I cabinet

More news