Project Overview

In response to the need for market-based revenue and on-site auxiliary power continuity at a hydro plant, FFD POWER deployed a 105kW/233kWh BESS in Bulgaria as a front-of-the-meter asset to provide energy arbitrage while reserving capacity for backup supply. The project addresses two needs at the plant level: capturing peak–valley price spreads as a front-of-the-meter (FTM) asset, and maintaining auxiliary power during outages or maintenance. By reserving a defined SOC for backup and using the remaining energy window for arbitrage, the system enables reliable value stacking under EMS control.

Project Background

The customer operates a hydro power plant in Bulgaria. As electricity price spreads widen, the site sought an additional revenue stream by participating in price-based energy arbitrage. At the same time, the plant can experience outages or planned maintenance events, during which auxiliary loads still require stable power. The project therefore required a front-of-the-meter (FTM) BESS that could be dispatched for arbitrage while preserving a guaranteed energy reserve for backup—implemented through EMS coordination and SOC reservation logic.

Project Challenge

FFD POWER Solution

FFD POWER delivered a 105kW/233kWh FTM BESS for a hydro power plant in Bulgaria. The EMS implements an SOC reservation strategy: a configurable backup reserve is maintained at all times, while the remaining usable SOC window is cycled for energy arbitrage. During low-price periods, the PCS charges the battery up to the arbitrage upper SOC limit; during high-price periods, it discharges down to the reserved backup threshold. When the plant experiences an outage or enters maintenance mode, the system prioritizes backup operation to supply designated auxiliary loads using the reserved energy, improving operational continuity while still enabling routine revenue generation.

System Specifications

Operational Logic: FTM Arbitrage with SOC-Reserved Backup

The EMS stacks two value streams by separating the battery SOC into an arbitrage window and a backup reserve: