Powering a 160kW Fast-Charger on a 30kW Grid in Ukraine

Project Overview

In response to Ukraine’s rapidly growing electric vehicle (EV) market, FFD POWER has deployed a cutting-edge Solar-plus-BESS for EV Charging solution. This project demonstrates how a Battery Energy Storage System (BESS) can bridge the massive gap between a restricted 30kW local grid and the high-power demand of a 160kW fast-charging station, all while integrating renewable energy and reducing operational costs.

FFD Power BESS for EV Charging in Ukraine - 522kWh Energy Storage System with Hybrid Inverter
FFD Power BESS for EV Charging in Ukraine - 522kWh Energy Storage System with Hybrid Inverter

Project Background

As EVs become a cornerstone of sustainable transportation in Ukraine, the strain on local electrical infrastructure has intensified. In many regions, the grid is “weak,” meaning it cannot provide the instantaneous high power required for modern DC fast chargers.

Project challenge

FFD POWER SOLUTION

FFD POWER implemented a sophisticated All-in-One BESS equipped with a Hybrid Inverter, creating a localized “Power Hub.”

System Specifications

Operational Logic: The "Power Booster" Effect

The core innovation lies in how the BESS manages energy flow to support the 160kW load: