800KW/1860KWH in Middle East

Project Overview

In response to rising time-of-use (TOU) tariffs and the need to maximize onsite solar self-consumption for retail facilities in the Middle East, FFD POWER deployed a rooftop PV-plus-BESS solution for a supermarket. The 0.8MW/1.86MWh LFP system, built with eight Galaxy 233L-AIO-2H units and intelligent EMS control, maximizes solar self-consumption, enables valley charging and peak-period discharge, and supports resilient on/off-grid operation.

“0.8MW/1.86MWh peak-shaving BESS site with a row of outdoor battery cabinets under an industrial shed; operator standing beside the system.”
Wide view of the peak-shaving installation showing multiple battery cabinets lined along a long building with a sloped roof.”

Project Background

Retail sites such as supermarkets typically exhibit long operating hours, pronounced evening demand peaks, and significant HVAC loads in warm climates. With strong daytime solar resources but volatile TOU tariffs, the site required a solution that could capture surplus rooftop PV generation, reduce grid imports during high-tariff hours, and maintain stable operation during grid disturbances.

Project Challenge

FFD POWER Solution

FFD POWER implemented a modular, scalable LFP battery system with a pre-integrated, plug-and-play design and an intelligent EMS. The EMS continuously coordinates PV surplus capture, tariff-aware charging, and peak-period discharge, delivering maximum economic returns while improving operational flexibility and resilience.

System Specifications

Operational Logic: The "PV-First + TOU Arbitrage" Strategy

The EMS co-optimizes PV self-consumption and TOU shifting to minimize grid purchases, demand peaks, and curtailment risk: